16011 |
Taplejung |
Sirijangha Rural Municipality |
Flood |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
2 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Yamphudin |
0 |
0 |
0 |
0 |
Nepal Police. |
Power House of Tumiya Khola Hydroelectric Project / Tikaram Gurung / Crusher Industry of Kabeli Hydro Power. |
16012 |
Taplejung |
Sirijangha Rural Municipality |
Flood |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
1 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
0 |
0 |
0 |
0 |
Nepal Police. |
Jagat Bahadur Rai / Tawa Khola Bridge & Jholunge Pul. |
16013 |
Panchthar |
Yangwarak Rural Municipality |
Flood |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
0 |
15000000 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Dhimale |
0 |
0 |
0 |
0 |
Nepal Police. |
Rabi Khola Small Hydropower System. |
16014 |
Taplejung |
Sirijangha Rural Municipality |
Landslide |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
3 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
|
0 |
0 |
0 |
0 |
Nepal Police. |
Tek Bahadur Limbu / Agni Prasad Limbu / Kumar Bayalkoti / Fandruwa Adarbhut Bidhyalaya |
16015 |
Panchthar |
Yangwarak Rural Municipality |
Flood |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
2 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Barme |
0 |
0 |
0 |
1 |
Nepal Police. |
Tharkaman Rai / Parshuram Pyakurel |
16016 |
Taplejung |
Meringden Rural Municipality |
Landslide |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
0 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Khurpathak |
0 |
0 |
0 |
0 |
Nepal Police. |
The dam of Mewakhola United Hydro Power, which is being built by Ramechhap Construction, has damaged approximately 40 meters of the wall of the dam in Mewa river. |
16017 |
Taplejung |
Sirijangha Rural Municipality |
Flood |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
0 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Yamphudin |
0 |
0 |
0 |
0 |
Nepal Police. |
Due to the flood in the Kabeli river, the building of the police station at Yamfudin is at risk. |
16018 |
Pyuthan |
Swargadwari Municipality |
Fire |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
1 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Naya Gaau |
0 |
0 |
0 |
1 |
Nepal Police. |
Kamal Bhandari |
16019 |
Panchthar |
Hilihang Rural Municipality |
Heavy Rainfall |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
0 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Kholakharka |
0 |
0 |
0 |
0 |
Nepal Police. |
Caused damage to Kabeli A hydropower (37.6 MW) project. |
16020 |
Taplejung |
Sidingba Rural Municipality |
Flood |
2023-06-15 |
0 |
0 |
0 |
0 |
0 |
0 |
|
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Tawakhola - Tawa/Nigure |
0 |
0 |
0 |
0 |
Nepal Police. |
The Zholunge bridge connecting Tawa and Nigure & the suspension bridge connecting Tindulpokhri from Yangmachour was completely swept away by the flood. |